working on it... Image not found

COVID-19 Response Office

PROJECT PROFILE


Project Partners: Wellstar Cobb Hospital

Building Use: Overflow space for COVID-19

Time: A few days

Download Case Study

Mobile Modular Swiftly Provided Overflow Space for COVID-19 Outbreak

Background

Mobile Modular was called upon to respond to the overload of patients and medical staff responding to the COVID-19 outbreak.


The Solution

Acting quickly, Mobile Modular was able to provide this overflow space within just a few days. Mobile Modular is honored to support those giving so much to our nation in this time of need.

Why Call Mobile Modular

By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.

If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.

Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!

Wellstar Cobb Hospital

Customer

Customer Name: Wellstar Cobb Hospital

Project Location

Project Location: Austell, GA

COVID-19 Response Office 1
COVID-19 Response Office 2
COVID-19 Response Office 3
COVID-19 Response Office 4
COVID-19 Response Office 5
COVID-19 Response Office 6

*Click on the image to see the full-size view!

Back to top