Permanent Modular Scale House
PROJECT PROFILE
Project Partners: Waste Management
Building Use: Modular Scale House
Time: 2 months
Download Case StudyMobile Modular Provided a Permanent Structure to Meet the Needs of Waste Management
Background
Waste Management in Logansport, IN was in need of a new scale house. They had been renting a mobile office that was too small for their needs and wanted to expand their space. Due to a new scale built at that location, they wanted to purchase the facility to be built on a permanent foundation.
The Solution
This facility is equipped with a scale house room, driver’s room, office, unisex restroom, supply closet, large conference room, and kitchenette. Modular construction proved to be an effective solution because it was designed, built, delivered, and installed in approximately 2 months.
Why Call Mobile Modular
By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.
If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.
Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!